Install Academy

Welcome to the COMPACKED Install Academy.

Our video tutorials provide step-by-step guides for assembling and installing components from structural, all the way through to the finishing touches with the gates and staircase.  Don’t forget, our friendly support team is here to help if you get stuck on anything – 1800 319 357

This video provides a detailed guide to installing structural steel components using the standard COMPACKED beam and Z purlin system. It covers marking post positions, levelling with rubber packers, and securing posts with screw bolts. 

Click here to view the Structural Steel Components Installation video.

This video demonstrates the installation of tongue and groove plywood flooring using the standard COMPACKED process. Floorboards are laid perpendicular to joists as per GA drawings, secured with Simpson Quikdrive or non-collated screws—28 fixings per full sheet. 

Click here to view the Installing Tongue & Groove Plywood Flooring video.

This video demonstrates the installation of hand railing using the standard COMPACKED process. The railing is lifted onto the mezzanine with a forklift for safety. Corner and end posts are fixed to the flooring using bolts with washers. 

Click here to view the Installing Hand Railings video

This video explains how to install a slide gate using the standard COMPACKED process. It starts with cutting the gate track to size and positioning it on the flooring. After testing the gate’s sliding motion, the gate catch assembly is installed on both ends—one as a regular catch and the other as a guide. Once secured, the gate’s level is checked. The track is then fixed to the floor, and a hole is drilled for the drop bolt. 

Click here to view the Installing Slide Gates video.

This video outlines the process of installing a swing gate using the standard COMPACKED method. The swing-over arms and panels are assembled with M12 bolts and washers, and fittings are slid onto the longer pivoting posts. These posts are connected to the gate arms and guided by O-ring fittings to ensure smooth swinging. Safety railings are cut to size and secured, along with gate posts fixed to the floor. A gas strut is fitted on both sides, and the final panel is added. 

Click here to view the Installing Swing Gates video

This video demonstrates how to install a corner staircase using the standard COMPACKED process. The platform is positioned and lowered onto posts using a forklift, with adjustments made to align posts with platform sockets. The top landing plate and stringers are secured, followed by positioning the treads, ensuring the top tread lip overlaps the vertical part of the tread below. Posts are bolted to the treads and stringers fixed to the platform and floor. 

Click here to view the Installing Staircases video.

How Our Service Works

Our state-of-the-art facilities in Central Victoria, combined with our dedicated team, work together to produce and ship high-quality factory and warehouse fit-out solutions to businesses all across Australia. From your initial inquiry to the delivery of your custom-fit components our streamlined process is focussed on ensuring your fitout runs as smooth as possible.

Step One

Select the products that you need for your job and submit a request for quote.

Step Two

Our consultants will create a costing and send it back to you asap.

Step Three

Review your costing & place your order. A consultant is available to answer any questions.

Step Four

Deliveries are packed and shipped to site upon dates agreed. All packages are wrapped in heavy duty plastic for weather proofing and include printed installation manual.

Scroll to Top