This video demonstrates how to install a corner staircase using the standard COMPACKED process. The platform is positioned and lowered onto posts using a forklift, with adjustments made to align posts with platform sockets. The top landing plate and stringers are secured, followed by positioning the treads, ensuring the top tread lip overlaps the vertical part of the tread below. Posts are bolted to the treads and stringers fixed to the platform and floor. The railing is cut to size and attached to posts, ensuring the top of the hoops is 1,000mm from the ground to comply with Australian Standards
Video Length: 4 Min 48 Seconds
View other Install Academy Videos
Don’t forget, our friendly support team is here to help if you get stuck on anything – 1800 319 357
Video Transcript
In this chapter, we’re installing the corner staircase using the standard compact process.
First, position the platform posts without fixing them down. Lift on the platform using a forklift and lower onto the posts.
Adjust the posts if needed, so they slide into the sockets under the platform.
Next, position the top landing plate and stringers, and secure them to the flooring at the top.
Position the tread on the tread legs. This will act as a spacer so the bottom of the stringers can be secured in the right spot.
Add in the rest of the tread.
The lip from the top tread covers the vertical part of the tread below.
Position the posts on the tread, and secure with the dome head m ten by thirty five millimeter bolts.
Drill and bolt the base of the stringers to the platform using the m twelve by sixty five millimeter bolts.
Make sure the posts are level, and fixed down with M12 by seventy five millimeter screw bolts.
Next, cut the railing to length.
Position the base stringers on the platform.
Repeat the same process used earlier, to position and secure the tread.
Secure the stringers to the platform using Domethead m12 by two hundred millimeter bolts.
Finally, bolt of all the treads, including posts where needed.
Bolt the bottom stringers to the floor with M12 by seventy five millimetre screw bolts.
Slide in the railings, using the fixings provided to attach them to the posts.
The top of the hoops needs to be one thousand millimetres from the ground, so make sure to check this.
Don’t forget, our friendly support team is here to help if you get stuck on anything – 1800 319 357
How Our Service Works
Our state-of-the-art facilities in Central Victoria, combined with our dedicated team, work together to produce and ship high-quality factory and warehouse fit-out solutions to businesses all across Australia. From your initial inquiry to the delivery of your custom-fit components our streamlined process is focussed on ensuring your fitout runs as smooth as possible.
Step One
Select the products that you need for your job and submit a request for quote.
Step Two
Our consultants will create a costing and send it back to you asap.
Step Three
Review your costing & place your order. A consultant is available to answer any questions.
Step Four
Deliveries are packed and shipped to site upon dates agreed. All packages are wrapped in heavy duty plastic for weather proofing and include printed installation manual.